CoreSpan Sourcing building inquiry options
CoreSpan Sourcing is an independent sourcing service. These cards are buyer-defined request options for pre-engineered steel buildings and for steel warehouses, workshops, and hangars. A card does not mean the unit is in stock, that a factory has been audited, or that the searched brand will supply it.
Inquiry options
No inquiry option matches that search. Clear the text or switch family, then describe the missing configuration in the form.
After you pick a card, add footprint, eave height, wind speed, ground snow load, quantity, and destination in the requirement field. See which quote rows must match before you send the brief.
What a card does not decide
Choosing Clear-Span Steel Building or Steel Aircraft Hangar names the inquiry. The card does not set bay spacing, collateral load, or the wind exposure category. Those values stay in your text. A multi-bay frame and a clear-span frame answer different floor plans, so do not ask a factory to price them as one line. An insulated system needs the insulated metal panel thickness and the thermal transmittance you want checked. A warehouse card still needs dock count. A workshop card still needs any crane capacity the process requires. A hangar card still needs the door opening.
Quantity can be one building or several identical frames. Destination can be a ZIP code or a port. Say whether freight is inside the number you hope to compare. If the slab, anchor bolts, and erection are someone else's contract, write shell. If you want the supplier to carry delivery to the pad, write delivered. Installed and turnkey are wider and still need an exclusion list for utilities and permits. The desk will not convert those words into a single total.
Documents to mention in the same message include the design criteria you already have and the drawings you want back. A request for AWS D1.1 weld notes or an IAS AC472 statement is a question to the supplier, not a statement that the document exists. Leave the budget blank when you have no range. If you add one, mark USD or another currency and whether it is per building or the whole project. Premium, mid-range, budget, or undecided is a preference, and the factories still have to answer the same specification.